State and province guides / Quebec
Quebec compost facility recordkeeping requirements
- Agency
- MELCCFP
- Citation
- Guide sur le recyclage des matières résiduelles fertilisantes (Guide MRF)
What Quebec expects you to record
- The MRF guide sets the pathogen-reduction and recordkeeping expectations for compost applied to land.
- Documentation is generally expected in French for submissions to the ministry.
Pathogen reduction (PFRP) in practice
Canada has no federal equivalent of 40 CFR 503 — the rules are provincial, and most track the CCME Guidelines for Compost Quality, which use the same time and temperature pairs: windrows must hold 55 °C or above for 15 days with at least five turnings during that period, while aerated static piles and in-vessel systems must hold 55 °C for three consecutive days. The evidence is the temperature record — which is exactly what tends to be incomplete when it lives on a clipboard.
How PileProof records it
- Crews log temperatures from a phone, offline if the yard has no signal, against the specific batch.
- Each batch's PFRP status is recalculated on every reading, using a compliance profile you can point at Quebec's thresholds.
- A missed day or a cold reading flags the batch AT RISK the same day, in the app and in a daily email digest.
- Certificates, activity reports and a full audit binder export on demand, with the raw data behind them.
Track Quebec batches without the clipboard
Start a free 14-day trialPileProof is a record-keeping tool, not legal advice. Verify report formats and thresholds with your state agency and permit.