State guides / Colorado

Colorado compost facility recordkeeping requirements

Agency
CDPHE
Citation
6 CCR 1007-2 Part 1 §14 (composting facilities)

What Colorado expects you to record

  • Class I / II / III classifications carry different monitoring and reporting expectations.

Pathogen reduction (PFRP) in practice

Most states build on the federal process in 40 CFR 503 Appendix B: windrows must hold 55 °C or above for 15 days with at least five turnings during that period, while aerated static piles and in-vessel systems must hold 55 °C for three consecutive days. The evidence is the temperature record — which is exactly what tends to be incomplete when it lives on a clipboard.

How PileProof records it

  • Crews log temperatures from a phone, offline if the yard has no signal, against the specific batch.
  • Each batch's PFRP status is recalculated on every reading, using a compliance profile you can point at Colorado's thresholds.
  • A missed day or a cold reading flags the batch AT RISK the same day, in the app and in a daily email digest.
  • Certificates, activity reports and a full audit binder export on demand, with the raw data behind them.

Track Colorado batches without the clipboard

Start a free 14-day trial

PileProof is a record-keeping tool, not legal advice. Verify report formats and thresholds with your state agency and permit.